How to Calculate Synergies in an Acquisition

How to Calculate Synergies in an Acquisition

Synergy is the extra value two businesses create together that neither would create alone. To calculate it, estimate each source of savings or growth from the bottom up, subtract the one-time costs to achieve it, adjust for timing and risk, and add up only what you can trace to a specific contract, process, site or role.

This guide explains the basic formula, how to estimate cost and revenue synergies in a manufacturing deal and how to test each number before it goes into the price. Most of that testing happens in operational due diligence.

Key takeaways

  • Synergy value is the combined value minus the two standalone values, minus the cost to get there.
  • Build each estimate from the bottom up, line by line, never as a percentage of revenue.
  • Cost synergies are easier to prove than revenue synergies.
  • Subtract one-time costs and account for timing, or the estimate will look better than it is.
  • Every synergy needs an owner and a baseline before close.

What is synergy in an acquisition?

Synergy in an acquisition is the value the combined company creates beyond what the two companies would create separately. It comes from lower costs, higher revenue or better use of assets, and it only counts once it shows up in actual results.

The basic synergy formula

In its simplest form:

  • Synergy value = value of the combined company minus (value of company A + value of company B) minus the one-time costs to achieve the synergies.

In practice, buyers estimate it line by line:

  • Annual synergy for each item = (baseline cost or revenue) minus (expected cost or revenue after the change).
  • Net synergy = sum of annual synergies, phased by when each one starts, minus one-time costs to achieve, adjusted for the chance each one is delivered.

The line-by-line method is the one to trust. It forces every number to point at something real in the operation.

How to calculate cost synergies

Cost synergies come from spending less on the same output. In a manufacturing deal, they usually fall into a few groups.

  • Procurement: combined spend on materials, components and indirect categories.
  • Footprint: combining or specializing plants, lines or warehouses, common when a platform adds a bolt-on acquisition.
  • Overhead: shared finance, HR, IT and purchasing.
  • Logistics: combined freight lanes, carriers and warehouses.
  • Operational improvement: less scrap, better yield and higher throughput from shared standards.

For each item:

  1. Take the baseline from actual records for an agreed period.
  2. Describe the change that creates the saving: which contract, process, site or role.
  3. Estimate the new cost after the change, using quotes, standards or demonstrated performance.
  4. Record the one-time cost to achieve it and the month the saving starts.
  5. Name the owner who will deliver it.

How to calculate revenue synergies

Revenue synergies come from selling more: cross-selling, new channels or products the combined company can now make. They are harder to prove and slower to arrive than cost synergies.

Wharton's analysis of why acquisitions disappoint lists overestimated synergies among the main reasons acquisitions disappoint. Estimate revenue synergies by customer and product, discount them for risk, and keep them separate from cost synergies in every report.

Count the costs to achieve and the timing

Most synergies cost money to deliver: severance, moving equipment, customer qualification runs, system changes or outside help. Subtract these one-time costs from the synergy value.

Subtract dis-synergies as well: customers, volume or people the combination may lose, and any retention costs to keep them.

Timing matters as much as size: a saving that starts late is worth less, and carries more risk, than one that starts early.

Phase each synergy by the month it is expected to start, and check that the plant can absorb the changes in that order.

How to test a synergy estimate before you rely on it

Test each synergy before it goes into the price. Any unclear answer means the estimate needs more work.

  1. Where exactly does it come from: which contract, process, site or role?
  2. Does the baseline come from actual records, and does finance agree with it?
  3. Does the operation have the capacity and the people to make the change?
  4. What does it cost to deliver, and when will that cost fall?
  5. Does it depend on another change, such as a plant move or an ERP cutover?
  6. Could the same saving be counted twice by two teams?

Operational due diligence is where most of these questions are answered. See our operational due diligence for manufacturers and the manufacturing due diligence checklist.

For how the accounting review and the plant review fit together, read operational due diligence vs quality of earnings.

From the estimate to the tracker

Once the deal closes, the estimate becomes the starting point for tracking. Each synergy moves from potential to approved to realized, and finance confirms the realized number from actual results.

Our guide to synergy tracking after an acquisition shows the tracker columns and the monthly review. The 100-day manufacturing integration checklist shows where synergy work fits in the first 100 days.

Common mistakes when calculating synergies

  • Top-down percentages. A percentage of revenue is not an estimate; build it line by line.
  • No one-time costs. Net value is what matters.
  • No timing. Phase each synergy by the month it starts.
  • Double counting. One saving, one owner, one number.
  • Revenue synergies mixed with cost synergies. Keep them in separate lines.
  • Ignoring plant capacity. A footprint saving needs the receiving plant to run the extra volume.

Frequently asked questions

How do you calculate synergy?

Estimate each source of savings or extra revenue line by line from an agreed baseline, subtract the one-time costs to achieve it, phase it by the month it starts and adjust for the chance it is delivered. The total of those net, phased amounts is the synergy value you can rely on.

What is the formula for synergy?

At the deal level, synergy equals the value of the combined company minus the standalone values of the two companies, minus the costs to achieve it. At the working level, each synergy equals the baseline cost or revenue minus the expected result after the change.

What are dis-synergies?

Dis-synergies are losses caused by the combination itself, such as customers that leave because of a new owner, volume lost during a plant move or people who resign during the change. Subtract them, along with any retention costs, from the synergy estimate so the net number is realistic.

Who should estimate synergies in a deal?

The deal team leads, finance validates the baseline and the people who will deliver each synergy help build the estimate. In a manufacturing deal, plant, purchasing and supply chain leaders should check every operational synergy before it goes into the price.